GE Building 43

Construction Cost Final Amount = $6 MillionSize 31,000 sfContract Date January 2016Completion Date October 2016 Design Build MLB Construction, LLC One Stone Break Rd Malta, NY 12020 518-289-1371 The GE Power & Water Building 43 was originally constructed in 1952 for what GE said was for use as an industrial clinic. Forty-six years later in […]

Market32 Clifton Park, NY

Construction Cost Contract Amount = $7,100,000Size 55,000 sfContract Date October 2016Completion Date April 2017 The Golub Corporation has been a long standing client for MLB. MLB broke ground on the brand new Market 32 in Clifton Park and hit the ground running. This 55,000SF building had to adhere to an aggressive, eight month schedule. As […]

New York State Racing Association Saratoga Race Course Copper Roof – Saratoga Springs, NY

Construction Cost Contract Amount = $2,009,600 Final Amount = $2,797,116 Size 13,333 sf Special Distinctions All new heavy timber framing & ornamental structural steel Contract Date January 2018 Completion Date May 2018 MLB was pleased to be awarded the Saratoga Race Course Grandstand Copper Roof replacement project. All new copper-clad roofs replaced the well known, […]

RPI – North and E

Construction Cost Final Amount = $3MSize 39,000 sfContract Date June 2016Completion Date August 2016 After sitting unoccupied for three full years, Rensselaer Polytechnic Institute needed to come up with a solution to house their increasingly large incoming freshman class. RPI engaged MLB to manage the rapid renovation and restoration of the school’s North and E […]

SUNY Plattsburgh Clinton Dining Hall Renovation

Construction Cost Contract Value = $6,622,400Size 22,000 sfContract Date February 2017 Completion Date Phase 1: August 2017 Phase 2: January 2018 The complete renovation of the SUNY Plattsburgh Clinton Dining Hall included all kitchen, dining area, and restroom facilities. This project was scheduled into three phases: May 2017—August 2017 included the dining space. September 2017—January […]

Adirondack Museum Visitor Center

Construction Cost $3,200,000Start Date September 1998 Completion Date June 1999 Two months of Fall, five months of harsh Winter, and two months of Spring high in the rugged Adirondack Mountains of New York State was the setting for this ambitious project at the Adirondack Museum. With only a four-month window to capitalize on the “Summer” […]

The Exploris Museum now the Marbles Kids Museum – Raleigh, NC

Cost Total Project $36.5 million MLB Contract $8.5 millionSize 80,000 sf Location Raleigh, North Carolina Duration 28 Months The Exploris Museum is the world’s first global interactive museum and hands-on learning center for children and adults. The facility contains a mixed use of materials including brick walls, LIES glass, colored concrete, and a structural steel […]

Morocco Pavilion at Epcot – Kissimmee, FL

Walt Disney World Resort The Morocco Pavilion is part of the World Showcase within Epcot at the Walt Disney World Resort and was the first expansion pavilion to be built, opening in 1984. The Pavilion was designed to look like a Moroccan city, with a realistic Minaret and features the restaurant, Marrakesh with distinctive arched […]

Desmond Hotel

As a previous client, The Desmond called upon MLB to assist with design changes to the existing pool facility in the center of the building’s courtyard. After review, it was determined that the area would be best be suited as a large banquet room with a central fountain in order to host events. Working closely […]