Blog

SUNY COBLESKILL– RENOVATE WAREHOUSE AND REPLACE PM SHOP AND POLE BARN

Construction Cost Contract Amount = $5,353,500 Final Amount = $TBD   Size 15,152 sf   Contract Date October 2023   Completion Date December 2025   Architect Architecture +- 297 River Street Troy NY 12180   Owner State University Construction Fund H Carl McCall Bldg 353 Broadway Albany NY 12246   We will be removing an existing pole barn and replacing with a new pre-engineered metal building. The new building will have two spaces, an open air vehicle storage building and an enclosed workshop with breakroom. We will be renovating an existing warehouse and maintenance shop. Exterior renovations include upgrading the…

Oct 17, 2024 / by admin / Comments are off for this post

LS POWER OPERATIONS SUPORT FACILITY Princetown| NY

Construction Cost Contract Amount = $3,459,000 Final Amount = $3,776,000   Size 14,600 sf Contract Date July 2023   Completion Date September 2024   Architect Laberge Group 4 Computer Drive West Albany NY 12205   Owner LS Power Grid NY Corporation 16150 Main Circle Dr. Ste 310 Chesterfield MO 63017 ———– The LS Power Operations Support Facility is a brand new pre-engineered metal building with over 14,000 square feet of space. The building features a secure vestibule for visitors, a work space, meeting space, fully equipped kitchen and restrooms. The building also has a mezzanine area for storage, among other…

Oct 17, 2024 / by admin / Comments are off for this post

THE GLEN AT HILAND MEADOWS KITCHEN AND DINING RENOVATIONS

This project involves renovation of existing Dining Rooms, Kitchen Facilities, Dining Admin Spaces, and the creation of a new Bistro. Upgrades to the Dining room, Main Lobby, and Corridors incorporate new LED lighting, finishes throughout.  The introduction of a new Bistro incorporates the latest concept in “cooking prep/ self service” to enhance socialization and interaction between residents. This project was completed in 4 phases: Phase 1 – Reconstruction of the Kitchen area, new wall, 2 new doors, new flooring. Phase 2 – Reconstruction of existing small dining area to be converted to a bistro, pizza oven, new mechanicals, plumbing, new…

Apr 02, 2024 / by admin / Comments are off for this post

CARDIOLOGY AND SPORTS MEDICINE CENTER

The new facility at the Saratoga Hospital Malta Medical Campus is a 2nd floor shell space that was designed as a typical clinic space providing eight exam rooms surrounding a centrally located nurses’ station, except the clinic provides larger exam rooms to accommodate specialty functions, including day treatment room, echo room, and a stress lab, and also provides a cardiac rehab space. Construction Cost Contract Value = $1,256,650   Size 9,800 sf   Contract Date April 2020   Completion Date October  2020   Architect Hyman Hayes Associates LLC 6 Wembyl Court Albany NY 12203   Owner Saratoga Hospital 211 Church…

Apr 02, 2024 / by admin / Comments are off for this post

SUNY PLATTSBURGH MEMORIAL HALL RENOVATION PHASE II

Renovation of existing facility. This is Phase II of a two Phase project to complete the renovation of Memorial Hall. Work includes structural and non structural removals, structural steel and concrete structural modifications, interior finishes and MEP work. Interior finishes of the entire project include new tile flooring, new tile locker rooms, high end collegiate locker room finishes and lockers, architectural millwork, new gymnasium sport floor, bleachers and gym equipment.  MEP work includes complete removal of existing systems with new equipment, infrastructure, lighting and special systems.  Work of this project will be performed while previously completed Phase 1 is occupied…

Apr 02, 2024 / by admin / Comments are off for this post

SHAKER PLACE NEW CHILD DAYCARE CENTER

Albany County’s Shaker Place Rehabiitation and Nursing Center recently renovated the former Shaker Wing, approximately 6,800 sqft. into a New Child Daycare Center. “The center will provide an added incentive to help attract and retain skilled nursing staff,” said County Executive, Dan McCoy. The project kicked off with a compete interior demolition down to the buildings shell.  Followed by the construction of a new front entrance vestibule addition with a canopied entrance which matches the others around the establishment.  The existing wing was renovated into a 5 classroom daycare wing, which includes a large multi-purpose play room, kitchen, break room…

Apr 02, 2024 / by admin / Comments are off for this post

ALBANY AIRPORT TERMINAL EXPANSION

The renovation and expansion happening at the Albany International Airport is an interesting one for MLB in that a large part of the project is taking down and replacing something we built to begin with. Back in 1999, MLB completed the construction of the rotunda and pedestrian bridge that have now been brought to the ground. In the first phase of the project – known as bid package 2 – MLB with the help of various subcontractors will be completing the majority of the site work, the mass demolition required for the new pedestrian bridge, micropiles, foundations, and the structural…

Apr 02, 2024 / by admin / Comments are off for this post

NCSU WOMEN’S BASKETBALL LOCKER ROOM RENOVATION

NC State’s historic women’s basketball program upgraded their locker room that will strengthen the experience of the student-athletes and help the team continue competing for and winning championships at the highest level. Enhancements to the teams locker room included: expanding the player lounge and nutrition areas, new player lockers, renovated showers and restrooms, salon, sleeping pods and water massage tables and new sound system with color-changing LED lighting. Scopes included mechanical, Electrical, Plumbing, Fire Protection, Millwork, Plumbing, Fire Protection, Millwork, Storefront Doors and Glass, Acoustical Specialties, Flooring, Tile, etc. Construction Cost Contract Amount = $639,000.00 Final Amount = $766,800.00 Size…

Apr 02, 2024 / by admin / Comments are off for this post

WAKE COUNTY COMMUNITY CENTER—PHASE II RENOVATIONS

The Community Services Center is the second oldest building of Wake County’s inventory. The building was constructed in 1913 as the Wake County Home for the Aged and Infirmed. More recently, the facility has housed various Wake County Behavioral Health Partners. The second phase of this project includes first-floor renovations, second-floor improvements, expanded toilet facilities, modernizaƟon of the building exterior, new landscaping, HVAC updates, and electrical system distribuƟon system replacement. The Interior/exterior renovaƟon of the historic property also included reconfiguraƟon of stairwells, a restroom for compliance with the current building code, updaƟng building finishes, and window restoration. Construction Cost Contract…

Feb 29, 2024 / by admin / Comments are off for this post

BOARD OF ELECTIONS RENOVATIONS PHASED 2

The Wake County Board of Elections RenovationsPhase II Project includes upfitting approximately 23,000 square feet of warehouse area to provide much-needed training space, support service areas, and meeting rooms. The project will include improvements to the building envelope and the building’s functional efficiencies and sustainability; enhancements to mechanical, electrical, plumbing, and security systems; and accessibility improvements. Site improvements include amending the existing stormwater BMP, building a new circulation drive, new landscaping, accessible sidewalks and ramp, and repavement of the truck service court. Construction began just after the 2020 elections and substantial completion was achieved on September 5, 2021, in time…

Feb 29, 2024 / by admin / Comments are off for this post