Construction Cost
Contract Amount = $3,459,000
Final Amount = $3,776,000
Size
14,600 sf
Contract Date
July 2023
Completion Date
September 2024
Architect
Laberge Group
4 Computer Drive West
Albany NY 12205
Owner
LS Power Grid NY Corporation
16150 Main Circle Dr. Ste 310
Chesterfield MO 63017
———–
The LS Power Operations Support Facility is a brand new pre-engineered metal building with over 14,000 square feet of space. The building features a secure vestibule for visitors, a work space, meeting space, fully equipped kitchen and restrooms. The building also has a mezzanine area for storage, among other storage areas, and below that, a locker room complete with another restroom, shower area and washer and dryer. The warehouse portion of the building houses a multiple configurations of racking and shelving systems and several overhead door openings, one of those being a 40’ wide overhead bifold door. The building also features radiant heating throughout and an 80’ long trench drain for ease of maintenance in the warehouse space. The exterior of building includes a retention pond, parking spaces and covered outdoor storage.